32-Hectare Logistics Terminal & 8-Hectare Song Toan Bonded Warehouse at Ta Lung
A strategic complex comprising 3 core terminal clusters (Phu Anh 80,000m², Son Cang 30,000m², Vu Thanh 14,000m²), Song Toan bonded warehouse (12,000+m²), 70+ continuous reefer power stations, and a 120-ton weighbridge directly connecting National Highway 3 with Ta Lung — Shuikou International Gate.
3 major terminal clusters: Phu Anh, Son Cang, and Vu Thanh
Full logistics network linking Song Toan bonded warehouse and express center
400+ mixed commercial vehicles/day, processing ~6,880 tons cargo daily
18m weigh platform synced with automated VNACCS weight verification
Son Cang dedicated 380V continuous power supply for refrigerated agri-cargo
Rapid border release protocols eliminating checkpoint bottlenecks
4 Core Operational Infrastructure Hubs
Engineered with standardized one-way traffic circulation, separating dry container queues, cold chain staging, and customs inspection yards.
32-HA CONTAINER TERMINALHeavy-Duty Truck & Container Staging Terminal (Phu Anh, Son Cang, Vu Thanh)
Reinforced heavy-duty concrete pavement exceeding 100 tons floor capacity, advanced drainage channels, and intelligent one-way traffic routing.
- 100T reinforced industrial concrete slab
- Intelligent one-way vehicular traffic flow
- 24/7 AI security surveillance cameras
BONDED & CFS HUBSong Toan Bonded Warehouse & CFS Logistics Hub
Official licensed bonded facility meeting Customs standards, spanning 8ha (80,000m²) for temporary import-re-export and consolidation.
- On-site customs procedures & inspection
- International NFPA fire protection certification
- 100% comprehensive warehouse liability coverage
COLD CHAIN NETWORKSon Cang 24/7 Reefer Container Power Stations
Continuous 380V power stations for 70+ reefer containers daily, dedicated substation and backup generators preserving agricultural exports.
- Unbroken cold chain guarantee
- Dedicated transformer & 1000kVA backup generator
- 24/7 IoT automated temp/humidity sensors
DIGITAL CUSTOMS GATE120-Ton Weighbridge & Covered Customs Inspection Yard
An 18-meter electronic weighbridge platform with 120-ton capacity, automated license plate recognition, and real-time VNACCS transmission with 5,000m² inspection canopy.
- Automated camera-based ALPR recognition
- Direct real-time link to VNACCS customs portal
- 5,000m² all-weather covered inspection apron
Modern Heavy Machinery & Cross-Border Fleet
Equipped with 45-ton reach stackers, mobile truck cranes, and cross-border tractors guaranteeing cargo integrity and rapid turnaround.




Technical Standards & Facility Tolerances
All equipment and civil engineering structures are fully accredited by the General Department of Customs and Vietnam Ministry of Transport.
| Infrastructure Component | Engineering Specs | Compliance Standard | Operational Note |
|---|---|---|---|
| 120-Ton Electronic Weighbridge | 18m x 3.4m steel weigh platform, 120T load rating | Class III Accuracy (DLVN 13:2009) | Integrated ALPR camera recognition & real-time VNACCS transmission |
| Heavy Container Staging Yard | 32 hectares unified terminal, reinforced concrete slab (>100T load capacity) | TCVN 4054:2005 (H30-XB80 Heavy Duty) | One-way traffic routes, underground drainage, 24/7 high-mast lighting |
| Song Toan Bonded Warehouse & CFS | 8ha (80,000 m²) covered & apron storage, 9.5m clear ceiling height | General Dept of Customs & NFPA Fire Safety | Barcode WMS inventory control, on-site customs inspection office |
| Reefer Container Plug-In Stations | 70+ 3-phase continuous 380V power stations at Son Cang terminal | IEC 60309 Electrical Safety Standard | Dedicated transformer substation & automated backup generator |
| -18°C Deep Cold Storage Facility | Flexible multi-temperature chambers (+5°C down to -18°C) | HACCP & ISO 22000 Food Safety Accredited | Continuous 24/7 IoT sensors with real-time temperature log recording |
| Daily Vehicle Clearance Capacity | 100+ containers cleared daily (400+ mixed vehicles daily, ~6,880 tons/day) | Turnaround KPI: < 2 Hours / Green Channel | Synchronized coordination between Border Guard, Customs & Dispatchers |
| Automated Fire Protection & Foam | 1,200m³ underground water tank, 50m hydrants, foam sprinklers | TCVN 3890:2023 & NFPA 13 | Ministry of Public Security certified, 24/7 emergency response drills |
| AI CCTV & 24/7 Perimeter Security | 120+ 4K AI cameras covering 100% yard, perimeter intrusion sensors | ISPS Code Port Security Benchmark | 90-day cloud recording, direct telemetry link to dispatch & police |
Strategic Cross-Border Transit Coordinates
The Ta Lung Quang Minh logistics hub is directly positioned at the origin of Vietnam National Highway 3, directly facing Shuikou International Port (Longzhou, Chongzuo, Guangxi, China). It constitutes the shortest freight corridor connecting Northern agricultural heartlands and Hai Phong seaports with Guangxi’s 50-million consumer market and Southwestern China.
- Counterpart Border Gate: Shuikou International Gate, Longzhou, Chongzuo, Guangxi, China
- Transit Arteries: National Highway 3 and upcoming Dong Dang — Tra Linh Expressway
- Distances: 60km to Cao Bang City, 280km to Hai Phong Deepwater Port, 250km to Hanoi
- Ta Lung 2 International Border Bridge: Dual-lane heavy freight bridge eliminating border congestion
Reserve Yard Slots & Receive Competitive Tariffs
Please leave your shipment specifications. Our terminal dispatch directors will provide tailored quotations and handling solutions within 30 minutes.
Request a B2B Logistics Quotation
Submit your cargo details to receive a tailored quotation and optimal routing plan within 30 minutes